Week 5
Bread Oven Demolition

Still on the breadoven demolition. We've been taking this down very carefully. That, plus the amount of material coming out of the structure has made the process really slow. Anyway, we are down to the ground with just the section remaining closest to the gable wall. The first shot is of the inside of the dome prior to demolition taken through the oven entrance on the inside of the house. We've now sealed that up. The structure was built by a craftsman and fitted together like a chinese puzzle.

And from the back. We are going to retain the circular section - last photo, left-hand side. It'll be a memento of the oven and a nice outdoor space to boot.

Fencing

We attached the fencing material to the posts, it made the front garden seem a lot bigger.